Delhi
+21°C
You are Here: Home » Departments » Civil Engineering

Civil Engineering » Civil I

 

DEPARTMENT’S NAME

CIVIL ENGINEERING DEPARTMENT – ROAD SECTOR
OVERALL-IN-CHARGE – Er.SANJAY ARORA, CHIEF ENGINEER (CIVIL-I),
(M)9915711456 (O)011-23341521, Extn.3602.

Departmental Hierarchy Chart

 


CORRIGENDUM: INVITATION FOR EXPRESSION OF INTEREST (EOI) FOR STRENGTHENING AND UPGRADATION OF DRAINAGE SYSTEM FROM Q-POINT (OPPOSITE TAJ HOTEL) TO BARAPULLA NALLAH THROUGH SUNEHRI PUL NALLAH.


INVITATION FOR EXPRESSION OF INTEREST (EOI) FOR STRENGTHENING AND UPGRADATION OF DRAINAGE SYSTEM FROM Q-POINT (OPPOSITE TAJ HOTEL) TO BARAPULLA NALLAH THROUGH SUNEHRI PUL NALLAH.


ROLES AND RESPONSIBILITIES

Roles:-

    • Resurfacing & Strengthening of Roads/ Lanes/ Colony Roads etc.
    • Maintenance of Roads and footpath / walkways.
    • Road Cut Permissions, feasibility and monitoring at site.
    • Installation & Maintenance of Road Signage and Street furniture’s.
    • Removal of malba from Public Streets.
    • Construction & Maintenance of Subways, Underpasses & Foot Over Bridges.
    • Construction & Maintenance of PTU’s and CTU’s.
    • Running and Operation of Bus-Q-Shelters.
    • Mechanized Sweeping on major roads through Mechanical Road Sweeper.
    • Improvement, Up gradation and De-silting of Drainage System/ Lines.
    • To Improvement, Development, construction & beautification of Roads, Lanes, Street Furniture and Civil Work in Parks etc.
    • To provide better riding quality on roads/Lanes and to achieve the goal of zero complaint of water stagnation in the area and to provide quality maintenance of Roads/Lanes/street furniture/Drainage system and parks (Civil Works).

Responsibilities:-

  • No person should deposit any sort of Malba/ Building rubbish on Public Roads/ Streets except designated point.
  • No person should tether any animal on any Public Street/ Road.
  • Barricading provided by NDMC for repair of any road should not be removed by any citizen.
  • No person should damage any public Road/ Street/ Parks.
  • No building material should be stacked/ placed and No barricading, Scaffolding should be done by any person on Public Road/ Street.
  • All the Roads in the private premises should be leveled, paved with adequate drainage provision.
  • Improvement, up gradation and desalting of drainage system/ lines.
  • The Smart City Projects such as , Digital Interactive Panels, Digital Information Panel, e-Scooter, Smart Underground Bins, Smart BQS, etc.
  1. ARCHIVES

 

ASSETS MAINTAINED IN ROADS DIVISIONS IN NDMC AREA

Descriptions

Total

Total Road   Lanes  Length

1280 Km

Total Length of Footpath

372 Km

Road Signages Type-I, Type-II & Type-III Boards

5343 Nos.

Rotaries (Roundabouts)

52 Nos.

Length of Covered Drains

578 Km

Manhole (Drainage)

11907 Nos.

Gully Gratings/ Bell Mouth

14264Nos.

Total Road Service Centers

23 Nos.

JCB 3DX Super Machine

1 Nos.

Rain Water Harvesting Pits

141  Nos.

Rain Water De-watering Pumps

44 Nos.

Parks (Including Small Park/ Colony Park)

816Nos.

Subways

16 Nos.

Public Conveniences         
193 PTU’s are on PPP Model.

276 Nos.

 

PTU’s

CTU’s

Existing

243

33

WC’s

687

350

Foot Over Bridges

04 Nos.

Flyovers

02 Nos.

Busts / Statues

15 Nos.

Underpasses

03 Nos.

Bus Q Shelters

197 Nos.

Open Gym/Playing Equipment

64 Nos.

  1. INFRASTRUCTURE (INQUIRY / SERVICE CENTER – DETAILS)

SE (NORTH ROAD DIVISION & CONSTRUCTION-III)

 

Er.T.R.MEENA SUPRINTENDING ENGINEER (ROAD NORTH & CONSTRUCTION-III), In-Charge of Division – Road-I, Road-V, & Connaught Place Division. Ph.011-23363874, Extn.3659

 

BRIEF ABOUT DEPARTMENT

 

Road Circle consists of Six Divisions such as R-I, R-II, R-III,R-IV, R-V & Connaught Place Division and main work are resurfacing , maintenance of roads/ streets/ back lanes/ colony roads. The main functions of the Store division is to procure various materials for consumption/usage for the requirement of maintenance and construction division, the items include Cement, Paint, Water Supply and Sanitary Fittings, Bitumen Aggregate and Emulsion, Timber, Pipe and Fittings, Building Material like Yamuna Sand, Coarse Sand, Red Bagri, Stone Aggregate etc. and further distributions to various departments of Civil Engineering of both Building Maintenance and Road Maintenance. The main theme of Store Division is as given below:-

 

a.To procure and issue the materials required for smooth working of NDMC for the public utilities.

 

b.To procure the material accordingly to the CPWD specifications.Improvement, Development, construction & beautification of Roads, Lanes, Street Furniture and Civil Work in Parks etc.

 

c.To Improvement, Development, construction & beautification of Roads, Lanes, Street Furniture and Civil Work in Parks etc.

 

d.To procure better riding on roads/lanes and to achieve the goal of zero complaint of water stagnation in the area and to provide quality maintenance of Roads/Lanes/street furniture/Drainage system and parks (Civil Works).

 

e.The functions of field staff are given below:-

 

  • Resurfacing and Strengthening of Roads/Lanes/Colony Roads etc.
  • Maintenance of Road.
  • Road cut Permissions.
  • Road Signage.
  • Street furnitures.
  • Removal of Malba from Public Streets.
  • Construction & maintenance of Subways, Underpasses & Foot Over Bridges.
  • Maintenance of Bus-Q-Shelters.
  • Mechanized sweeping on Major Roads
  • Improvement, up gradation and de-silting of drainage system/ lines.
  •  

    ROAD DIVISION -I

     

    Er. Sanjeev Kumar Sharma, Executive Engineer (Road-I)

    23388822

     

    1. Er. P.K. Bansal (Assistant Engineer)

    23722146

     

    Janpath Lane Service Centre (Sub-Division-I)

    23722146

     

    Jurisdiction:- Area bounded by Ashoka Road (from Gole Dak Khana to Windsor Place Roundabout), Bangla Sahib Lane, Hanuman Road, Hanuman Lane, Jai Singh Road, Jantar Mantar Road (from Tolstoy Marg to Ashoka Road) Janpath (from Scindia House to Windsor Place Roundabout), Janpath Lane, Sansad Marg (from Bank of Baroda to Patel Chowk) and Tolstoy Marg (from Sansad Marg to Janpath).

     

    2. Er. P.K. Bansal (Assistant Engineer)

    23070591

     

    Dr. Rajender Prasad Lane Service Centre (Sub-Division-I)

    23070591

     

    Jurisdiction:- Area bounded by Ferozshah Road (from Windsor Place to Kasturba Gandhi Marg), Kasturba Gandhi Marg, Madhav Rao Scindia Marg (from Ferozshah Road to K.G. Marg), Jaswant Singh Road, Dr. Rajendra Prasad Road, Ashoka Road (from Windsor Place to C-Hexagon) Janpath (from Windsor Place to Dr. R.P. Road), Atul Grove Road, Tolstoy Marg (from Janpath to Kasturba Gandhi Marg). Dr. R.P. Lane (between Janpath to Dr. R.P. Road), Lane behind Meridian Hotel, Tolstoy Lane No.1 & 2, Electric Lane, Jaswant Singh Lane, Harish Chander Mathur Lane No.1 (from K.G. Marg to Janpath), P&T Qtr. Lane and Lane behind Eastern Court (Ferozshah Road to Atul Grove Road), Lane behind Chander Lok Building, Pt. Ravi Shanker Shukla Lane (from K.G. Marg to Navyug School Pataudi House), Telegraph Lane, Atul Grove Lane to Harish Chander Mathur Lane and Connaught Lane (from K.G. Marg to Janpath).

     

    3. Er. Bijender Singh (Assistant Engineer)

    23382961

     

    C-II Flats (Tilak Lane) Service Centre (Sub-Division-II)

    23382961

     

    Jurisdiction:- Area bounded by India Gate, C-Haxagon, Tilak Marg, C-I/C-II Flats, Purana Quila Road, Shershah Road, High Court, Dr. Zakir Hussain Marg, Kaka Nagar, Bapa Nagar, Pandara Road, Pandara Park & Children Park, Bhagwan Dass Road upto Tilak Marg, Supreme Court, Subramanium Bharti Marg (from Mathura Road to Dr. Zakir Hussain Crossing).

     

    4. Er. Bijender Singh (Assistant Engineer)

    23070144

     

    Sangli Mess Service Centre (Sub-Division-III)

    23070144

     

    Jurisdiction:- Area bounded by Bhagwan Dass Road (from Mandi House Roundabout to Tilak Marg), Sikandra Road, Bengali Market, Babar Road, Copernicus Road, Ferozshah Road (from Mandi House Roundabout to                           K.G. Marg), Hailey Road, Shanker Market, Barakhamba Road, Tolstoy Marg (from K.G. Marg  to Modern School) and Connaught Lane (from K.G. Marg to Barakhamba Road).

     

    5. Er. Bijender Singh (Assistant Engineer)

    23383795

     

    Sangli Mess Drainage Service Centre (Sub-Division-IV)

    23383795

     

    Jurisdiction:-  Area bounded by Tilak Marg, C-Hexagon, Mahatma Jyoti Rao Phule Marg, Jaswant Singh Road, Dr. Zakir Husain Marg, Safdar Hashmi Marg, Todar Mal Road, Purana Quila Road, Shershah Suri Road, Bhagwan Dass Road, Jantar Mantar Road, Tolstoy Marg, Sansad Marg (from C.P to Patel Chowk), Subramanuim Bharti Marg (from Dr. Zakir Husain Marg to Mathura Road), Atul Grove Road, Hailey Road, Babar Road, Madhav Rao Schindia Marg, Dr. Rajender Prasad Road, K.G. Marg, Janpath Road (from C.P to R.P. Road), Hanuman Road, Jai Singh Road, Barakhamba Road, Pandara Road, Ashoka Road, Copernicus Marg, Ferozshah Road, Sikandra Road, Tansen Marg, Abul Fazal Road & Sunanda Bhandare Marg.

     

     


    Road-V Division

     

    Er.M.S.Meena, Executive Engineer, (Road-V)

    23742249

    1. Er.N.S.Chauhan (Assistant Engineer)

    23346108

    Mandir Marg Drainage Service Centre (Sub-Division-I)

    -

    Jurisdiction:- Whole area of R-V Division.

    2. Er. Jaswant Singh (Assistant Engineer)

    23344259

    T.T. Park Road Service Centre (Sub-Division-II)

    -

    Jurisdiction:- Area bounded by Sec-IV, Raja Bazar, B.K.S. Marg, Bangla Sahib Marg & Bhagat Singh Marg.

    3. Er. Jaswant Singh (Assistant Engineer)

    23326494

    Church Lane Road Service Centre (Sub-Division-III)

    -

    Jurisdiction:- Area bounded by North Avenue, Pt. Pant Marg, B.K.S. Marg, Sansad Marg, Red Cross Road, Raisina Road, Mahadev Road MP Flats.

    4. Er. Jaswant Singh ( Assistant Engineer)

    23369248

    Udyan Marg Road Service Centre (Sub-Division-IV)

    -

    Jurisdiction:- Area bounded by Mandir Marg, Bhai Veer Singh Marg, Gole Market area, DIZ area, Sec-I, II & III, Park Street, R.K. Ashram Marg.

     

    CONNAUGHT PLACE DIVISION

    Er. Sanjeev Kumar Sharma, Executive Engineer

    23362429

    Connaught Place

    Er. Jaswant Singh, Assistant Enigneer

    23368442

    Hanuman Road Service Center

    Jurisdiction:- Area bounded by Connaught Place including Inner Circle, Middle Circle & Outer Circle, Seven Radial Roads, Panchkuian Road upto Basant Lane and Minto Road upto NDMC limit area..

    MAIN ACHIEVEMENTS IN THE YEAR 2022-2023

    WORK COMPLETED

     

    S. No.

    Name of work

    E/Cost

    T/Value

    Remarks

    1.

    Resurfacing of Ashoka Road and Ferozshah Road

    Rs. 2.95 Crore

    Work completed.


    Ferozshah Road

    Ashoka Road

    Rail Bhawan Circle

    Parliament Circle, Sansad Marg

    WINDSOR PLACE CIRCLE

    CIRCLE AT JUNCTION OF JANPATH AND RP ROAD

    MAJOR TARGETS FOR THE YEAR 2023-24

    S. No.

    Name of work

    E/Cost

    T/Value

    Remarks

    1.

    Providing EPDM flooring under the open gym equipments in major parks.

    Rs. 90.00 lacs

    Work will be completed

    2.

    Development of Raja Bazar Park, New Delhi

    Rs. 45.00 lacs

    Work will be completed

    3.

    Resurfacing Eight avenue roads with cold milling process

    Rs. 5.33 Crore

    Work will be completed

    4.

    Resurfacing of 12 roads in R-V Division

    Rs. 11.50 Crore

    Work will be completed

    5.

    Infrastructure up-gradation of all key roads under jurisdiction of R-I Division

    Rs. 1.61 Crore

    Work will be completed

    6.

    Repair to footpath at Key roads in R-V Division

    Rs. 54.30 lacs

    Work will be completed

    7.

    Repair of footpath, toe wall, planter, parking area, subway of Key roads in Connaught Place

    Rs. 60.89 lacs

    Work will be completed


    WORK IS IN PROGRESS
    R-I DIVISION

    KERB STONE SHIFTED IN R-V DIVISION

    CP DIVISION

    CONTACT US:-

    ER.T.R.MEENA

    OFFICE OF THE SUPRINTENDING ENGINEER (NORTH ROAD) & (CONSTRUCTION-III)
    ROOM NO. 1506, 15TH FLOOR CIVIL ENGINEERING DEPARTMENT
    NEW DELHI MUNICIPAL COUNCIL, PALIKA KENDRA
    SANSAD MARG, NEW DELHI 110001
    M-9810681155,
    (O) – 011-23363874
    ,EXTN.NO:-3659

    SE (ROAD-SOUTH DIVISION)

    Er.G.S.AGARWAL
    SUPRINTENDING ENGINEER (SOUTH ROAD) & SMART CITY,
    In-Charge of Division:- Road-II, Road-III, & Road-IV Division.

    M-9810427534
    Ph.011-233416215, Extn.3621

    BRIEF ABOUT DEPARTMENT

    In charge of Division Road-II, Road-III, & Road-IV under circle-SE (South Division) with look after the improvement & up-gradation and maintenance of roads, subways, parks, footpath, signage, kiosk, playing equipment etc.

    FUNCTIONS & RESPONSIBILITIES

    S.E.(Road-South), In charge of Road Divisions i.e. Road-II, Road-III and Road-IV under Civil-I, look after the improvement & up-gradation and maintenance of roads, subways, public toilet, parks, footpaths, Bus-Queue-Shelters, signage, kiosks, playing equipment etc. Following works are being done in (Road-South) Circle of Under Civil-I:-

    1. To provide better riding quality on roads/lanes and to achieve the goal of zero complaint of water stagnation in the area and to provide quality maintenance of roads/lanes/street furniture/ drainage system and parks (civil works).
    2. Improvement, development & Beautification of roads/ lanes, street furniture and civil work in parks etc. to achieve the aims and objective as aforesaid.
    3. Maintenance of the area and proposal of various schemes, preparation of estimates, all actions to call and finalize the tenders, updating of relevant records of road/lanes/road furniture/drainage system etc.
    4. Road Cut Permissions.
    5. Road Signage’s including directional Signage’s and other Signage’s including Roundabouts.
    6. Street furniture
    7. Maintenance of roads.
    8. Maintenance of Statues, Memorials and Busts.
    9. Construction and Maintenance works of cycle tracks, cycle stand, Bus- Q-Shelters etc.
    10. Construction, maintenance alteration & improvements of publicstreets, bridges, culverts, cause-ways and the like.
    11. Construction, Maintenance and Cleaning of drains and drainage works.
    12. Removal of Malba from public streets.
    13. Construction & Maintenance of Subways, Underpasses & Foot Over Bridges.

    MAIN ACHIEVEMENTS DURING THE FINANCIAL YEAR 2022-23

    S.No

    Name of Work

    Tender Amount (In Lakh)

    Remarks

    1

    Name of work:- S/R of Roads in NDMC area during 2019-20. SH:- Re-Carpeting of Roads with Cold Milling Process.

    Rs. 384.65 Lakh

    Work Completed

    (Shahjahan Road , Akbar Road, Shershah Road & Shanti Path)


    WORK IN PROGRESS

    S.No

    Name of Work

    Tender Amount (In Lakh)

    Remarks

    1

    Name of work:- S/R of Roads in NDMC area. Sub-head:- Infrastructure Up gradation of key roads / important road ( Janpath Road, Dr. APJ Abdul Kalam Road, Prithviraj Road, Shahjahan Road , Maulana Azad Road , Safdarjung Road) leading to key roads under jurisdiction of R-II Division (Sub. Div.-I&II) -G-20 Works

    Rs.88.50 Lakh

    Work in progress

    2

    Name of work:- S/R of Roads in NDMC area. Sub-head:- Providing and Laying of Thermoplastic Paint for upgradation of area under jurisdiction of R-II Division - G-20 Works.

    Rs. 47.47 Lakh

    Work in progress


    MAJOR TARGETS FOR THE YEAR 2023-24

    S.No

    Name of Work

    Tender Amount

    (in Lakh)

    Remarks

    1

    Name of work:- Smart City in NDMC area. Sub Head:- Providing and fixing water body with fountain in York Place roundabout facing each road. jurisdiction of R-II Division (Sub. Div.-I&II) -G-20 Works

    Rs. 137.25 Lakh

    Preliminary Estimate Under scrutiny

    MAIN ACHIEVEMENTS DURING THE FINANCIAL YEAR 2022-23

    WORK COMPLETED : - NIL -

    WORK IN PROGRESS :

    S.No

    Name of Work

    Tender Amount (In Lakh)

    Remarks

    1

    Name of work:- S/R of Roads in NDMC area. Sub-head:- Infrastructure Up gradation of key roads / important road (Aurobindo Marg, Lodhi Road and Subramanium Bharti Marg) leading to key roads under jurisdiction of R-II Division (Sub. Div.-III, IV & V) -G-20 Works.

    Rs.97.16 Lakh

    Work in progress


    MAJOR TARGET FOR THE YEAR 2023-24:

    1

    Name of work:- S/R of Roads in NDMC area. Sub-head:- Providing and applying of SMA at Safdarjung Flyover, T-Point, Lodhi Road-Aurobindo Marg, Jor Bagh Road-2nd Avenue Crossing and Amrita Shergill MArg, Rajesh Pilot Marg, crossing roundabout under jurisdiction of R-II Division Div.-III, IV & V).

    Rs. 96.17 Lakh

    Preliminary Estimate under scrutiny.

    2

    Name of Work:- Development of Lodhi Garden

    Sub-Head:- Providing and laying EPDM jogging track in Lodhi Garden.

    Rs. 392.75 Lakh

    Preliminary Estimate under scrutiny.

    MAIN ACHIEVEMENTS DURING THE FINANCIAL YEAR 2022-23

    WORK COMPLETED : - NIL -

    WORK IN PROGRESS :

    S.No

    Name of Work

    Tender Amount (In Lakh)

    Remarks

    1

    Name of work:- Providing and Fixing of MS Railing in Sarojini Nagar Market area.

    Rs.90.00 Lakh

    Work in progress


    MAJOR TARGET FOR THE YEAR 2023-24 :

    S.No

    Name of Work

    Tender Amount

    Remarks

    1

    Name of Work:- Development of Sanjay Lake, Laxmi Bai Nagar 

    Sub-Head:- Providing and laying EPDM jogging track in Sanjay Lake.

    Rs. 1.68 Crore

    NIT under scrutiny

    2

    Name of Work:- Resurfacing of Lanes under R-III Div.

    Rs. 5.00 Crore

    CRRI to be appointed for Technical Evaluation


    MAIN ACHIEVEMENTS IN THE YEAR 2022-23:

    Sr.

    No.

    Name of work

    Estimated cost

    Tendered amount

    Remarks

    1

    Now:- S/R of Roads in NMDC area.

    SH:- Providing and fixing sand stone sculpture fountains in the area under Jurisdiction of S.E (R-south)

    Rs. 23,67,138.00

    Rs. 21,57,410.00

    Work completed

    2

    Road Improvement program in NDMC area during 2019-20

    SH: Strengthening and Resurfacing of R/abouts T-Junctions with SMA including Thermoplastic Road marking paint, Solar Power studs and Retro Reflective studs in the area under R-IV Division during 2019-20 

    Rs. 2,25,24,399.00

    Rs. 2,01,00,774.00

    Work completed


    WORK IN PROGRESS:

    Sr.

    No.

    Name of work

    Estimated cost

    Tendered Amount

    Remarks

    1

    Providing and Fixing MS Railing towards green belt(jungle side) at Sardar Patel Marg

    Rs. 3,37,94,714.00

    22527556.00

    Work in progress

    2

    Sub-Head: Infrastructure up-gradation of key Roads under Jurisdiction of R-IV Division -G-20 works (Sardar Patel Marg, Rizal Marg, Malcha Marg, Mother Teressa Cresent, Shanti Path , Nyay Marg, Africa Avenue, Kemal Ataturk Marg & Teen Muti Marg)

    Rs. 1,68,88,396.00

    1,05,02,910.00

    Work in progress

    3

    NOW:- Road Improvement programme in NDMC area during 2018-19.

    SH: Construction of RCC Security wall along Teen Murti Lane in PM House.

    Rs. 1,61,22,754.00

    1,59,61,526.00

    Work in progress


    MAJOR TARGET FOR THE YEAR 2023-24:

    Sr.

    No.

    Name of work

    Amount

    Remarks

    1

    Name of Work: Strengthening of Roads under R-IV Division

    Sub-Head:- Providing and Laying Red sand stone slab footpath at San Martin Marg (Bapu dham Side) from Abai Marg to Manas Marg.

    PE. Rs. 28,09,700/-

    DE Rs. 27,88,800/-

    NIT under approval

    2

    Name of Work: Strengthening of Road under R-IV Division

    Sub-Head: Providing and Laying Red sand stone slab at Alexender M. Kadakin Marg at Taj Hotel Side

    PE Rs. 28,74,100/-

    DE Rs. 28,54,600/-

    NIT under approval


    3

    Name of work:- Street Scraping of Roads in R-IV Division during 2023-24

    Sub. Head:- Repair/ Improvement to Existing Footpath at Kamal Attaturk Marg.

    PE Rs. 28,73,500/-

    PE under approval`

    4

    Name of work:- Road improvement programme in NDMC area.

    Sh:- providing and fixing M.S.Railing at central verge of Kamal Attaturk Marg.

    PE Rs. 38,88,715/-

    DE Rs. 38,59,900/-

    NIT Rs. 36,76,021/-

    Tender under award

    5

    NAME OF WORK:- Street Scraping of Roads in R-IV Division during 2022-23.

    SH: - Repair/Improvement to Existing Footpath between PM House Rotary to Pradhan Mantri Sanghera Rotary at Teen Murti Marg.

    PE Rs. 29,07,200/-

    DE Rs. 28,96,200/-

    NIT Rs. 27,58,205/-

    At Tender stage


    WORK COMPLETED:

    Sl.

    No.

    Name of work

    Amount

    (in Lacs)

    Remarks

    (Status of work)

    1.

    Road Improvement programme in NDMC area during 2021-22. SH:-Construction of Roads in Between Vietnam Embassy and Singapore High Commission

    Rs.55.00

    Work completed


    WORK IN PROGRESS:

    Sl.

    No.

    Name of work

    Amount (in Lacs)

    Remarks

    (Status of work)

    1

    Name of work:-Upgradation of Major Garden into World Class (SMART CITY). SH:-Providing the dedicated cycle track along the outer periphery of Nehru Park, New Delhi.

    Rs.266.00

    Work in progress

    2.

    Name of work:-UP gradation of major garden into World class (Smart city).Sub-head:-Supplying and installation of sprinkler and smart control irrigation system in Nehru Park.

    Rs.238.00

    Work in progress

    3.

    Up-gradation and improvement of road infrastructure for G-20 summit 2023.

    SH:-Providing and laying of thermoplastic paint for up-gradation of area under jurisdiction of
    R-IV Division - G-20 works

    Rs.42.00

    Work in progress


    MAJOR TARGETS FOR THE YEAR 2023-24:

    Sl.

    No

    Name of work

    Amount

    (in Lacs)

    Remarks

     (Status of work)

    1

    Name of work:-Refurbishment of Road Signages and Strengthening of Road Safety Devices in NDMC Area

    Rs.3000.00

    Preliminary Estimate Under scrutiny

    2.

    Name of work:-Design of safe, seamless and continues cycle network from New Moti Bagh to North Block and South Block with extension to Rafi Marg, Red Cross Road and Gurudwara Rakabganj. SH: Construction of cycle track from New Moti Bagh to Sunehri Bagh Road round about, New Delhi.

    Rs. 1130.00

    Preliminary Estimate Under scrutiny

    3.

    Name of work- Upgradation of Major Garden into World Class (SMART CITY).SH:-Construction of Athletic Synthetic Track on the existing concrete/katcha surface in Nehru Park.

    Rs. 69.00

    Preliminary Estimate Under scrutiny


    ROAD-II DIVISION

    Er.Sanjeev Kumar Sahrma, Executive Engineer, (Road-II)

    23073515

    1.Er.Satpal (Assistant Engineer)

    Tees January Lane (Sub-Division-I)

    23070592

    Jurisdiction:- Area bounded by Akbar Road (from Moti Lal Nehru Roundabout to C-Hexagon), Prithvi Raj Road (from Q-Point to Rajesh Pilot Marg Crossing), Aurangzeb Road (from Claridge Hotel to Q-Point), Moti Lal Nehru Marg (from Moti Lal Nehru Roundabout Q-Point), Shahjahan Road (from Q-Point to C-Hexagon), Man Singh Road (from Q-Point to Dr. Rajendra Prasad Road), Janpath (from Moti Lal Nehru Roundabout to Dr. Rajendra Prasad Road), Maulana Azad Road (from Sunehri Masjid Chowk to Man Singh Road Chowk), UPSC Lane, Vidyut Bhawan Lane, Darbhanga House Lane & Jam Nagar House Complex.

    2.Er.Satpal (Assistant Engineer)

    Man Singh Road Service Centre (Sub-Division-II)

    23792974

    Jurisdiction:- Area bounded by Tees January Marg, Prithviraj Road (from Rajesh Pilot Marg to Aurobindo Marg), Safdarjung Road, Tuglak Road, Akbar Road (from Rajaji Marg Roundabout to Moti Lal Nehru Roundabout), Kemal Attaturk Crossing to Claridge Hotel Roundabout), Rajesh Pilot Marg upto Prithviraj Road, Janpath (from Prithviraj Road to Moti Lal Nehru Roundabout).

    3.Er.B.K.Mishra (Assistant Engineer)

    Safdarjung Flyover, Service Centre (Sub-Division-III)

    24649238

    Jurisdiction:- Area bounded by Lodhi Road (from Safdarjung Madarsa to Max Muller Marg), Auronindo Marg (from Y-ford crossing to Safdarjung Flyover), Najaf Khan Road, West side of Max Muller Marg, Jor Bagh Colony, Lodhi Colony, B.K. Dutt Colony and Aliganj Colony.

    4. Er.B.K.Mishra(Assistant Engineer)

    Khan Market Drainage Service Centre (Sub-Division-IV)

    24651429

    Jurisdiction:- Area bound by India Gate to Akbar Road, PM House to Aurobindo Marg upto Safdarjung Road, Jor Bagh Road, Lodhi Road (from Safdarjung Tomb upto Archbishop Makarios Marg Red Light), Dr. Zaklr Hussian Marg (from Red Light to Subramanium Bharti Marg), Archbishop Makarios Marg, Maharishi Raman Marg, Max Muller Marg, India Gate to Race Course (from Prithivraj Road to Aurangzeb Road), Rajesh Pilot Marg, Tees January Marg, Tuglak Road, Maulana Azad Crossing to Janpath (Claridge Hotel), Man Singh Road to Q-point, Humayun Road, Maulana Azad Road (from Vice President House to Sunheri Masjid), IInd Avenue, IIIrd Avenue (Khanna Market) & Najaf Khan Road.

    5.Er.B.K.Mishra(Assistant Engineer)

    Golf Links Service Centre (Sub-Division-V)

    24648120

    Jurisdiction:- Area bounded by Archbishop Makarios Marg, Golf Links Colony, Bharti Nagar, Lodhi Estate, Lodhi Garden upto Prithviraj Road, Pandara Road Colony, Pandara Market A & B block, Shahjahan Road upto A-B Flats, Humayun Road, Khan Market, Amrita Shergill Marg & Rabindra Nagar.

    ROAD-III DIVISION

    Er.Shyam Sunder Sharma,Executive Engineer, (Road-III)

    23368005

    1.Er.Lovekesh Gusingha , (Assistant Engineer)

    Netaji Nagar Service Centre (Sub-Division-I)

    26870235

    Jurisdiction:-  Area bounded by Netaji Nagar, Nauroji Nagar, Africa Avenue, A to J Avenue, Netaji Nagar Colony Roads.

    2. Er. Lovekesh Gusingha (Assistant Engineer)

    Laxmi Bai Nagar Road Service Centre (Sub-Division-II)

    24675490

    Jurisdiction:- Area bounded by Laxmi Bai Nagar, East Kidwai Nagar, West Kidwai Nagar, Aurobindo Marg, Laxmi bai Nagar Colony Roads, Pillangi Village, AIIMS, Yusuf Sarai Market, Ansari Nagar (EAST & WEST), Laxmi Bai Nagar Mkt., Brig. Hoshiyar Singh Road (Pillanji Village-Safdarjung Flyover), Dilli Haat Surrounding Laxmi Bai Nagar, Aurobindo Marg-Yusuf Sarai.

    3.Er.Rajesh Gupta( Assistant Engineer)

    Moti Bagh Road Service Centre (Sub-Division-III)

    26871825

    Jurisdiction:- Area bounded by Charak Palika Hospital, Moti Bagh, Palika Kutumb Housing Complex, R.K. Puram, Aradhna Complex, Multistory R.K. Puram Sec-13, North West Moti Bagh, Vidhan Chand Bengali Sr. Sec. School, Moti Bagh-I, New Moti Bagh, Anant Ram Dairy, Palika Bhawan, Netaji Nagar, Part Of Shanti Path [Rail Museum - Moti Bagh], Basrurkar Mkt., Begam Zaidi Mkt., North Moti Bagh.

    4. Er.Rajesh Gupta( Assistant Engineer)

    Netaji Nagar Drainage Service Centre (Sub-Division-IV)

    24104630

    Jurisdiction:- Area bounded by Drainage - Whole area of R-III Division.
    Road – Main roads and lane-by-lane of Sarojini Nagar area including Pillanji Village.

    ROAD-IV DIVISION

    Er.Shyam Sunder Sharma Executive Engineer,(Road-IV)

    23344188

    1.Er.Mukesh Gupta(Assistant Engineer)

    Kautaliya Marg Road Service Centre (Sub-Division-I)

    23013341

    Jurisdiction:- . Area bounded by S.P. Marg, Mother Terresa Cresent, Niti Marg(From Kautilya Marg to Panchsheel Marg), Panchsheel Marg, Shanti Path and its Parrallel Road ( From Kautilya Marg to Satya Marg R/About), Nayaya Marg (Kautiltya Marg to Satya Marg), Chander Gupta Marg (Panchsheel Marg to Satya Marg), San Martin Marg, Dr. Radha Krishan Marg, Jesus & Merry Marg, Abai Marg, Officer's Mess Marg, Manas Marg, Simon Boliver Marg, Malcha Marg, Dharam Marg, Rajdoot Marg, Pt. Uma Shankar Dixit Marg, Bardoil Marg, Rizal Marg, Arti Gas Marg, TPT Road, Kamal Attaturk Marg, Cross Road No. 1 Ahmed Shah Masood Marg, Shanti Path to Niti Marg), Cross Road No. 2 Shanti Path to Chander Gupta Marg, Cross Road No. 3 Shanti Path to Chander Gupta Marg, Cross Road No. 4 Shanti Path to Chander Gupta Marg, Cross Road No. 4 Shanti Path to Chander Gupta Marg, Cresent Marg (A,B,C,D,E,F,X,Y, Cresent), Side Lane of Austria, Back Lane of Oman From Veera Wali to Viveka Nand Camp, Side Lane of UAE, Side lane of Veerawali to S.P. Rizal Marg, Back Lane of T.P.T. from San Martin to Ring Road, Back Lane of Diplomatic Enclave A Cresent (GP Marg to Rajdoot Marg) B Cresent, Back Lane of D,E & F, Side Lane of D,E,& F, Back Lane of Kautilya Marg, X Cresent Back Lane, Y Cresent (I), Side Lane of Chattis Garh, Fire Brigade Back Lane (I), Parellel Road to Dharam Marg, Kaventor Lane (Kautilya Marg to ESS/Palika Milan), Back Lane Anchal, Service Road S.P. Marg (11 Mort to Panchsheel Marg), Road arounf Park Between Malcha Marg/Panchsheel Marg, S.P. Marg Parrallel Road (Kushak Nallah to Panchsheel Marg), PM House (Out Side Area).

    2.Er.Mukesh Gupta(Assistant Engineer)

    Dara sikoh Road Road Service Centre (Sub-Division-II)

    23013341

    Jurisdiction:- Area bounded by Moti Lal Nehru Marg, Sunheri Bagh Road, K. Kamraj Marg, Krishna Menon Marg, Raja Ji Marg, Tyag Raj Marg, Dalhousie Marg, Tu-Tu Road, South Avenue, Kushak Road, Teen Murti Marg, Moti Lal Nehru Lane, Sunheri Bagh Lane, K. Kamraj Lane, Krishna Menon Lane, Kushak Lane, South Avenue Lane, Teen Murti lane, South Block.

    3.Er.J.P.Khokhar(Assistant Engineer)

    Nehru Park Road Service Centre (Sub-Division-III)

    26871825

    Jurisdiction:- Area bounded by Satya Marg (a) Madhulimay Marg to Vinay Marg R/A (b) Vinay Marg R/A to Niti Marg R/A (C) Niti Marg R/A to Shanti Path R/A (d) Shanti Path R/A to Nyay Marg R/A (e) Nyay Marg R/A to Chander Marg, Nyay Marg (a) Satya Marg R/A Rail Mueseum R/A, Niti Marg (a) Panchsheel Marg R/A to Satya Marg R/A (b) Satya Marg R/A to Rail Mueseum R/A, Chander Gupta Marg from Satya Marg to Rail Mueseum, Vinay Marg, Africa Avenue from Satya Marg to RUB, Madhulimay Marg, Cross Road No. 2 ton 5 from Niti Marg to Shanti Path (i) Andre Malraux Marg (ii) Eamon De Valera Marg (iii) Alexander Dubcek Marg (iv) Kwame Nkruah Marg, Hillary Marg & Tenzin Marg, Chanakya Cinema Road, Tikender Jeet Marg, G-Avenue from Satya Marg to RUB, Railway Enclave Road, Sanjay Camp, Shanti Path from Satya Marg to Rail Museum R/A.

    4. Er.J.P.Khokhar(Assistant Engineer)

    Kautaliya Marg Drainage Service Centre (Sub-Division-IV)

    24104630

    Jurisdiction:- Area bounded by Drainage - Whole area of R-IV Division.

    SMART PROJECT CIRCLE

    FUNCTIONS AND RESPONSIBILITIES

    Smart Project Circle is to design and implement some of Smart City Projects such as Digital Interactive Panels, Digital Information Panel, e-Scooter, Smart Underground Bins, etc.

    MAIN ACHIEVEMENTS DURING 2022 – 23

    (i) Work in Progress :-

    S.

    No.

    Name of Work

    Amount (in Lacs Rs.)

    Status

    1.

    Unified Command and Control Center

    Rs.111.15 Crores

    The work awarded to M/s. L&T and all infrastructure of ICCC and DC work was completed. Integration work for various module and ERP is in progress in consultation with user departments. 

    2.

    Engagement of Concessionaire for Design, Built, Operate Public e‐scooter Sharing System in NDMC area under PPP mode.

    PPP Project

    RFP was modified by the sub-committee and were invited but no bid received.

    MAJOR TARGETS FOR THE YEAR 2023-24 :-

    Sr.

    No.

    Name of Work

    (In Lacs.)

    Target

    1.

    ICCC

    Rs.111.15 Crores

    To complete the project

    2.

    e-Scooter

    PPP Project

    To recall tender and awarded the work.


    DIGITAL INTERACTIVE INFORMATION PANEL

    DIGITAL INTERACTIVE INFORMATION PANEL

    DIGITAL DISPLAY PANELS IN CP- 50 NOS

    SMART UNDERGROUND BIN

    SMART UNDERGROUND BIN (AFTER OPEN)

    INTEGRATED COMMAND AND CONTROL CENTRE (ICCC)


     Er.G.S Agarwal

     OFFICE OF THE SUPRINTENDING ENGINEER (SOUTH ROAD)

     ROOM NO. 1621, 16th FLOOR CIVIL ENGINEERING DEPARTMENT

     NEW DELHI MUNICIPAL COUNCIL, PALIKA KENDRA

     SANSAD MARG, NEW DELHI 110001

     M-7290061902, 9810427534

    (O) – 011-23341621,Extn.No:-3621


    SE(Public/Health) Circle

    Er. Ajay Gupta
    SUPRINTENDING ENGINEER (PUBLIC HEALTH CIRCLE), 

    In-Charge of Circle:– Public Health Circle

    Ph.011-23366471, Extn. 3508

     

    BRIEF ABOUT DEPARTMENT       

           PH circle is looking after all activities related to Water Supply & Sewerage Divisions, headed by individual Executive Engineers. Water Supply division deals with complaints regarding no water, contaminated water, less water/pressure, hand pump, bore well etc. provision of water trolley/ tankers for marriage functions, demonstration sites, religious functions, fixing/replacement of water meter, construction of bore-well/hand pump etc.  Water Supply Control Room functions Round the Clock. Besides the above activities, new projects like implementation of uninterrupted water supply, replacement of defective pipes/ valves  etc. Sewerage Division deals with complaints as blockage of sewer over flow, requirements of additional sewer, STPs, ETPs etc. All the above functions are in addition to sanctioning of new water and/ or sewer connection

    SEWERAGE PROJECT DIVISION

    BRIEF FUNCTION AND RESPONSIBILITY OF DIVISION:-

    The Sewerage Project Division is assigned with the job to evaluate the existing sewerage system of entire NDMC area. The division had been carrying out the work of augmentation of sewer line and rehabilitation of existing sewers in various areas of NDMC and Waste water management/ treatment for reuse treated water for irrigation purpose by Horticulture Deptt. Construction of sewerage treatment plant of capacity 100 KLD  to 500 KLD under PPP Project by using MBR Technology at Lodhi Garden, Nehru Park, Talkatora Park, Gole Market, Sanjay Lake Park, Moti Bagh, Park near Singapore Embassy, Rose Garden, Satya Sadan and 100 KLD STP at N.P. Bangali School, Gole Market by using Phytorid Technology.

    MAIN ACHIEVEMENTS DURING 2022-23.

     

    WORK COMPLETED

     

    S.NO

    NAME OF WORK

    AMOUNT 

    (IN RS.)

    STATUS


    1.

    Waste Water management/treatment for re use of water for Horticulture purpose. SH:-Operation and Maintenance of 150 KLD Tertiary Treatment Plant at Talkatora Garden.

     

    12,37,351/-

    Work Completed

     

    WORK IN PROGRESS

     

    S.NO

    NAME OF WORK

    AMOUNT 

    (IN RS.)

    STATUS

    1.

    Operation & Maintenance of 50 KLD  Sewerage treatment plant at Bharti Nagar  for 3 years

    11,90,700/-

    Work in progress

    2.

    Waste Water Management for reuse of water for Horticulture purpose. SH:-Operation and Maintenance of 100 KLD STP (based on Phytorid Technology) for 7 years at N.P Bengali School, Gole Market.

    30,58,500/-

    Work in progress

    3.

    Public Partnership (PPP) Project to develop additional water resource by installing STP’s 100 KLD to 500KLD (10 Nos.) In three group, infrastructure (Construction of Sewage Treatment Plant) in NDMC   Group-I

    100 KLD STP at Moti Bagh

    500 KLD STP at  Satya Sadan

    300 KLD STP at  Sanjay Park

    100 KLD STP at Talkatora Garden

    11,52,00,000/-

    Work in progress

    4.

    Public Partnership (PPP) Project to develop additional water resource by installing STP’s 100 KLD to 500KLD (10 Nos.) In three group, infrastructure (Construction of Sewage Treatment Plant) in NDMC 

    Group-II  

    200 KLD STP at Gole Market

    500 KLD STP at Nehru Park 

    100 KLD STP at Rose Garden Shanti path

    300 KLD  STP at Singapore Park

     

    14,65,20,000/-

    Work in progress

    5.

    Public Partnership (PPP) Project to develop additional water resource by installing STP’s 100 KLD to 500KLD (10 Nos.) In three group, infrastructure (Construction of Sewage Treatment Plant) in NDMC   Group-III  

    Lodhi Garden  100%

    Bharti Nagar   0%

    11,16,00,000/-

    Work in progress

    6

    Pre-Consultancy for the work of De-silting and rehabilitation of 1100 and 1200mm sewer line at Ashoka Road from Nirvachan Sadan to C-Hexagon.

     

    1,35,00,000

    Work in progress

    7

    Pre-Consultancy for the work of Rehabilitation of sewer in NDMC area SH:- De-silting and rehabilitation of brick barrel 1905mm dia from Khushak Nalah to Aurbindo Marg at Brigadier Hoshiyar Singh Marg.

     

    Work in progress

     

     

    8

    Pre-Consultancy for the work of Rehabilitation of sewer in NDMC area Sub- Head: - De-silting and rehabilitation of brick barrel 990mm dia from Outer circle CP to C-Hexagon through K.G. Marg.

     

    Work in progress

    9

    Pre-Consultancy for the work of Improvement of Sewerage system in NDMC area  SH:- Cured in place pipe (CIPP) lining of damaged sewer line from Satya Marg to Kautilya Marg at Shanti Path.

    Work in progress

    10

    Pre-Consultancy for the work of  Rehabilitation of sewer in NDMC Area.

    De-silting and rehabilitation of old sewer twin barrel of 2100 mm dia “NP-2 Class” RCC pipe from C-hexagon to Lodhi Road through Zakir Hussain Marg- Golf Course- Subramanium Bharti Marg.

     

    2,38,00,000

    Work in progress

    11

    Rehabilitation of old sewer Sub-Head: Rehabilitation of Brick Barrel 990mm dia from outer circle CP to C-Hexagon through K.G. Marg & Satya Marg to Kautilya Marg at Shanti Path by CIPP Structural Lining method”

    18,30,21,600+

    8,84,64,000=

     

    Work in progress 

     

     

     

     MAJOR TARGETS FOR THE YEAR 2023-24

     

    S.

    NO

    NAME OF WORK

    A/A & E/S        (IN RS.)

    STATUS

    1

    Rehabilitation of sewer in NDMC Area.

    De-silting and rehabilitation of old sewer twin barrel of 2100 mm dia “NP-2 Class” RCC pipe from C-hexagon to Lodhi Road through Zakir Hussain Marg- Golf Course- Subramanium Bharti Marg.

     

    107.00 Crore

    Tender  for main work was opened on  dated 31.08.2022 and under approval from Competent Authority.

    2

    Hybrid Annuity Project to develop additional water resources by installing ETPs 20 KLD to 70 KLD (5Nos.) at Dhobi Ghats, infrastructure, construction of effluent treatment plant in NDMC area and run for five year.

     

    RFP

    Modified RfP under approval from Competent Authority.

     


    3

    Public Private Partnership (PPP) Project to develop additional water resources by installing STP’s 100 KLD to 200 KLD (4 Nos.) infrastructure (construction OF STP) in NDMC area and run FOR 12 years.

     

    RFP

    Case for rejection is under approval.

    4

    Rehabilitation of sewer in NDMC area SH:- De-silting and rehabilitation of brick barrel 1905mm dia from Khushak Nalah to Aurbindo Marg at Brigadier Hoshiyar Singh Marg.

     

    13,85,60,400

    Tender was floated with last date of submission of bid 08.02.2023, Justification of rates under approval from planning Division since 08.02.2023

    5.

    De-silting and re-habilitation of 450mm dia NP-2 Class RCC pipe sewer line by cured in place pipe (CIPP) method  from Sadar Satel Mag to Shantipath to  Satya Sadan via Kautilya Marg, Madulimay Marg and along Kushak  Nallah.

     (under Phase-III).

     

     

    9,26,65,000

    Technical bid of  Pre & Post Consultancy work has been opened and under scrutiny by sub division level.

    6.

    De-silting and re-habilitation of 990 mm to 1143 mm dia sewer line by cured in place pipe (CIPP) method  from Shantipath via Panchsheel Marg (under Phase-III).

     

     

    25,01,27,000

    Agenda for approval of P.E was concurrence by F.D and is being put up on dated 18.04.2023 for further vetting by Law Dept. & subsequently for approval of Chairman, for placing before next Council Meeting.

    7.

    Re-habilitation of existing 600mm dia RCC sewer by Cured in place pipe (CIPP) method from Telegraph lane to Kashturba Ghandhi Marg via Madhav Rao Scindia Marg. (Under Phase-III)

     

     

    5,57,21,200/-

    Technical bid of Pre & Post Consultancy work has been opened and under scrutiny by sub division level.

     

    SEWERAGE MAINTENANCE  DIVISION

    Er.Shayam Sunder Sharma, Executive Engineer

    (Sewerage Project Division)

    M-7290061875,   (O) 011-23347352

                23745439

    BRIEF FUNCTIONS & RESPONSIBILITIES OF DIVISION

     

          Sewerage Maintenance Division is looking after the maintenance of sewerage system of the entire NDMC area. The sewerage system of NDMC area consists of about 300 kilometers of sewer lines of 150mm dia to 2100mm dia about 15,000 Nos. circular/rectangular manholes of various sizes and about 600 vent shafts for ventilation of sewers. Sewerage Control Room is located at XY-Block Sarojini Nagar for 24 hours attending of sewerage blockage complaints, etc. The cleaning of sewer lines, technical maintenance of the sewer lines and manholes, replacement of damaged sewer lines and manholes etc also lies within its responsibility. The complaints received on 311 App regarding de-choking of sewer lines / sewer stagnations are also attended by the Sewer Maintenance Division in the given time frame, providing sewer feasibility to residential / commercial units as and when sought along-with water connection shall also be the responsibility of Sewerage Maintenance Division.   The mechanical assets, sewer pump house and service centers is also maintained by the Sewerage Maintenance Division.

     

    Main Achievements During -2022-23

     

    Work completed

    S.

    No

    Name of work

    Amount in lacs

    Remark

    1.

     

    Deposit work (CPWD).  SH: Shifting and laying 300mm dia sewer line at Dara Sukoh Road, New Delhi.

     

    31.33

    Work completed.

    2.

    Deposit work (NBCC). SH:-Shifting of 450mm dia meter sewer line from Arya Samaj Mandir, Pillanji to Shri Vinayak Mandir Marg in Sarojini Nagar, New Delhi.

     

    70.16

    Work completed.

     

    Work in progress

     

    S.

    No

    Name of work

    Amount in lacs

    Remark (Status & % of work done)

    1.

     

    Hiring, Operation and Maintenance of 2 Nos. Jetting cum Suction Sewer Cleaning Machines With Water Recycling Technology (for Seven years).

    2424.94

    Work is in progress. 84.01% work has been completed.

    2.

     

    Hiring of two numbers of the Pressure Jetting cum sewer suction machine on Truck chassis for seven years.

    891.08

    Work in progress.   28% work has been completed.

    3.

     

    Deposit work (NBCC). SH:- Shifting of 300mmm dia sewer line from Gurudwara Sarojini Vihar to Arya Samaj Mandir, Pillanji Village, Sarojini Nagar.

    57.76

    Work in progress.  99% work has been completed.

    4.

    Hiring of 3 Nos. CNG Run High Pressure Jetting cum Sewer Suction Machine for Narrow Lanes, 2 Nos. 2T and 1 No. 6T Truck Chassis for 3 Years.

     

    156.20

    Work in progress.  17% work has been completed.

    5.

    Deposit Work (RVNL). SH:-Providing and laying 300mm dia sewer line from RVNL Multistory Housing Complex near Moti Bagh to Leela Palace Roundabout at BHS Marg.

     

    438.02

    Work in progress. 90% work has been completed.

     

    Major Targets For The Year 2023-24

     

    S.

    No

    Name of work

    Amount in Lacs

    Remark

    (Status of work)

    1.

     

    Deposit work (NBCC). SH:- Shifting of 200mm dia Sewer line from Delhi College of Art and Commerce to ESS Netaji Nagar.

    73.59

    Justification under scrutiny in Planning.

    2.

     

    Hiring, Operation and Maintenance of 2 Nos. Jetting cum Suction Sewer Cleaning Machines With Water Recycling Technology (for Seven years).

    2424.94

    Work is in progress. 84.01% work has been completed.

    3.

     

    Hiring of two numbers of the Pressure Jetting cum sewer suction machine on Truck chassis for seven years.

     

    891.08

    Work in progress.   28% work has been completed.

    4.

     

    Deposit work(NBCC). SH:- Shifting of 300mmm dia sewer line from Gurudwara Sarojini Vihar to Arya Samaj Mandir, Pillanji Village, Sarojini Nagar.

    57.76

    Work in progress.  99% work has been completed.

    5.

    Hiring of 3 Nos. CNG Run High Pressure Jetting cum Sewer Suction Machine for Narrow Lanes, 2 Nos. 2T and 1 No. 6T Truck Chassis for 3 Years.

    156.20

    Work in progress.  17% work has been completed.

    6.

    Deposit Work (RVNL). SH:-Providing and laying 300mm dia sewer line from RVNL Multistory Housing Complex near Moti Bagh to Leela Palace Roundabout at BHS Marg.

    438.02

    Work in progress. 90% work has been completed.

     

     

    INFRASTRUCTURE (INQUIRY/SERVICE CENTER–DETAILS)

    SEWERAGE DIVISION

     

    1

    Sewerage Control Room

    Sewerage Control Room, XY Block, Sarojini Nagar, New Delhi

    011-26870249

    2

    Scindia House

    Scindia House, Sewerage Service Centre, Behind Electric Service Centre, New Delhi

    011-23351009

    3

    Todermal Lane, Bengali Market

    Todermal Lane, Bengali Market, Sewerage Service Centre, New Delhi

    011-23326840

    4

    Mandir Marg Sewerage Service Centre

    Mandir Marg Sewerage Service Centre, Near St. Thomas School, New Delhi

    011-23345839

    5

    Khan Market

    Khan Market, Sewerage Centre, near Lok Nayak Bhawan, New Delhi

    011-24647295

    6

    Keventer Lane

    Keventer Lane, Palika Milan Complex, Sewerage Service Centre, Near Kautilya Marg, Malcha Marg, New Delhi

    011-23011168

    7

    XY Block

    XY Block, Sarojini Nagar, Sewerage Service Centre, Sarojini Nagar, New Delhi

    011-24121190

    8

    Bharti Nagar Pumping Station

    Bharti Nagar Pumping Station, Sewerage Service Centre, Back Side of Kothi No. 132, Golf Link, Bharti Nagar, New Delhi

    011-23351009

     

    WATER SUPPLY DIVISION

     

    BRIEF FUNCTIONS & RESPONSIBILITIES OF WATER SUPLLY DIVISION

     

          Water Supply Division is responsible for distribution of potable water received from Delhi Jal Board which is collected into 27 UGRs located different places in NDMC Area. Boosting of water is done thorough these UGRs during morning & evening hours. Besides distribution through piped network in entire NDMC area. The prevention of leakage / contamination also lies in its responsibility. New water connection area also sanctioned on demand from public. During short supply in particular area the demand is met though water tankers wherein a 24 hours. The connection 7 disconnection of water meters is also done by Water Supply Division.

     

    Er.Harkesh Meena, Executive Engineer (Water Supply)

    23745439

     

    MAIN ACHIEVEMENTS DURING 2022-23

     

    Work competed

    S.

    No

    Name of work

    Amount in lacs

    Remark

    1.

    Construction, Installing, Operating and Maintaining of water ATM and vending of Water from Water ATMs at NDMC area phase-II through EPC Mode Basis.

    14716111/-

    Work completed  on 4.12.2022

     

     

    Work In Progress

     

    S.

    No

    Name of work

    Amount in lacs

    Remark (Status & % of work done)

     

    1.

    Shifting of MS pipe line 300 dia across Arbindo Marg through trenchless method for construction of one no. Pedestrian underpass across Aurobindo Marg, Near Delhi Haat.

     

     

    Rs. 73.45 lacs

    Work in progress

    2.

     

    Strengthening of water supply infrastructure Assets in NDMC area. SH: Installation of 04 nos. 10,000 litres PVC water tank in Vivekanand Camp, New Delhi to extend the continuous water supply through pipelines of individual water connections

     

    20.74 lacs

    Work in progress

    3.

    Name of Work:- Construction of UGR and pumping infrastructure MLA- LAD Fund. SH:- Constructing of UGR and pumping for filtered water supply in Vivekananda camp,New Delhi.

    Rs. 18.65 lac

    Work in progress

     

    Major Targets For The Year 2023-24

     

    S.

    No

    Name of work

    Amount in Lacs

    Remark

    (Status of work)

    1.

     

    Name of Work: Repair and maintenance-Infrastructure Assets.

    Sub-Head:- Repair and Replacement of 150mm Dia CI line with DI pipe fraom Bhishambar Das Ayurevedic Dispensary to M.S. Flats, area under the jurisdiction of Sub-Division I

    14,23,281/-

            NIT under process

    2.

     

    Name of work : Repair & Maintenance Infrastructure Assets.

    Sub head  :  Repair & Replacement of 100mm dia. M.S line with D.I pipe at Faridkot House Lane from Coprnicus marg entrance to end point (NDMC Toilet) , area under the jurisdiction of sub division I(WS).

    15,20,277/-

              Tender Invited

    3.

     

    Name of Work : Repair and Maintenance - Vehicles.

    Sub Head : Repair of water tankers (Tata Make) by providing and fixing / replacement / repairing of defective parts of water tankers at water supply control room during 2022-23.

    4235891/-

    Annual estimate File put up for financial year 2023-2024

    4.

    Name of Work: Strengthening of Water Supply System in NDMC area.

    Sub-Head:- Providing and fixing water meters under area of Sub Division-I (WS)

    19,50,800/-

    NIT under process

    5.

    Subject: Appointment of consultant for holistic study the water supply network of entire NDMC area for furnishing Master Plan for another 25 years.

    RFP (3.50 Crore)

    RFP for this work has been prepared and is with Planning Deptt.

    7

    Strengthening of water supply infrastructure Assets in NDMC area. SH: Individual piped water connection  in the JJ Cluster and remaining unauthorized colonies under Jal Jeevan Mission (Har Ghar Jal)

     

     

    Rs.12.73 Crores

    Under Scrutiny in Finance.

    8

    Installation of  10,000 & 5000 litres PVC water tank and Grid line at Sanjay Camp, New Delhi.

    Rs. 44.53 lacs

    Tender Under Process

     

    9

    Providing and fixing new water meters in place of defective water meters/ provisional billing in consumer connection line is NDMC area.

     

    1.39 Crores

    P.E. under approval from competent authority.

    10

    Construction of tubewell in NDMC area. SH: Construction of three  nos. tubewell in NDMC area (Drinking Purpose)

    26,19,754/-

    Tenders has been invited.

    11

    Construction of 20 Nos Drinking water fountains in NDMC area.

     

     

    12

    Name of work:-   Repair and Maintenance- Infrastructure Assets in  NDMC area. Sub Head:-   Replacement of old and non-functional valves in water mains and constructing brick masonry chamber at East kidwai nagar,  under sub-division IV(W/S).

    Rs. 15.39 lacs

    DE under scrutiny in Circle Office.

    13

    N.W.O. :- Strenthening Of Water Supply System In Ndmc Area.   Sh : Replacement Of 6" Main Line Of Ci Line With Di Pipe At Golf Link Under  Sub-Division Iii (Ws)

     

     

     

    1,36,31,370/-

    Tender papers are under Scrutiny.

    14

    Name of work: Improvement of water supply system in NDMC area. Sub Head:  Replacement of 300 mm dia C.I. line with D.I. pipe from Bharti Nagar water boosting station to Delhi High Court including Kaka Nagar under Sub Division-III(W/S).

     

     

     

    5,40,43,300/-

    Tender Papers under scrutiny.

    15

    Name of work:     Strengthening of water supply system in NDMC area. Sub-head:     Replacement of 600mm dia H.S. Line with 600mm dia D.I. pipe at Maharishi Raman Marg.

    3,19,61,300/-

    DE under Scrutiny in Planning.

    16

    N.O.W : Replacement of water pipe line in NDMC area.S.H : Replacement of existing  06” C.I line with D.I Pipe at Darbhanga Lane area under Sub- Division-III(WS)

    62,84,100/-

    PE under Scrutiny in Planning.

    17

    Name of Work: Strengthening of Water Supply System in NDMC area Sub Head: Replacement of defective 03 No's C.I. Sluice valve at Neela Gumbad, Humayun Tomb under sub division III(W/S)

    25,23,500/-

    Tenders are being called.

    18

    Name of Work: Strengthening of Water Supply System in NDMC area. Providing and laying 06" main D.I line near DRDO Bhawan for maintain grid in water network in area under sub-division-III (WS)

    14,18,625/-

    Tenders has been called

     

    INFRASTRUCTURE (INQUIRY/SERVICE CENTER–DETAILS)

    Water Supply

    S. No.

    Service Station

    Address

    Phone Numbers

    WATER SUPPLY

    1.

    Water Supply Control Room

    Water Supply Control Room, Kali Bari Marg, New Delhi

    011-23743642, 23360683, 23747566, 23747568

    2.

    Sub Division-I
    Gole Market Service Centre

    Sub Division-I (Entire Area North of Rajpath), Gole Market Service Centre

    011-23362949

    3.

    Mandir Marg Service Centre

    Mandir Marg Service Centre

    011-23363519

    4.

    Sub Division-II
    Tilak Marg Service Centre

    Sub Division-II, Water Supply Service Centre, Water Boosting Station, Tilak Marg, Tilak Lane, New Delhi

    011-23385030

    5.

    Sub Division-III
    Jor Bagh Service Centre

    Sub Division-III, Jor Bagh Service Centre

    011-24626827

    6.

    Bharti Nagar Service Centre

    Bharti Nagar Service Centre

    011-24690264

    7.

    Sub Division –IV
    Vinay Marg Service Centre

    Sub Division –IV, Vinay Marg Service Centre

    011-26111295

    8.

    Netaji Nagar Service Centre

    Netaji Nagar Service Centre

    011-24104688

    9.

    Sub Station-V
    Mandir Marg

    Sub Station-V, Water Meter Work Shop, Mandir Marg, New Delhi, Near St. Thomas School

    011-23745439

     

    OFFICE OF THE SUPRINTENDING ENGINEER (PUBLIC HEALTH)

    NEW DELHI MUNICIPAL COUNCIL
    CIVIL ENGINEERING DEPARTMENT

    15th FLOOR,  ROOM NO. 1508,

     PALIKA KENDRA,  NEW DELHI 110001
     
    M-9811606869, 7290061910
    (O) – 011-23366471
    ,Extn.No:-3508

                    

    Water Control Room                   :    PH: 011-23743642, 23360683, 23747566, 23747568
    SE(PH) Office                                   :       (O)- 011- 23366471
    Executive Engineer (W/S)             :          M-  9891903970,   (O) 011-23745439 
    Executive Engineer (S/M-South)   :         M-  7290061875,   (O) 011-23347352
     

    Executive Engineer (S/P)               :          M-7290061875,    (O) 011-23347352

    Executive Engineer (S/M-North)              :          M-  9868535753,   (O) 011-23347352