Service Tunnel constructed in Middle Circle of Connaught Place for revamp of the existing services like Electrical, Tele-communication, Water supply, Irrigation, Fire Fighting, water lines & further ease in maintenance of these utilities:-
 
  • Tunnel length 1.2 Km
  • Connecting/Service Trench 5.5 Km
  • Structural Steel 500 MT
  • Cable Trays 24 Km
  • Cabling (HT/LT) 103 Km
  • Fire, Water and Irrigation Pipe 25 Km
  • Sewerage Line 6 Km
  • Drainage Line 4 Km
  • Underground Transformer – 20 Nos.
  • CCTV / Fire Alarm Monitoring through Control Room